Environmental Rehabilitation Projects

Tecosol's team is pleased to show you some of its largest environmental rehabilitation projects in Quebec in pictures. Thanks to adapted equipment and our expertise, we regularly help many people to clean up their soil and sites in an efficient manner.

2017

Longueuil
Spring 2017
Customer: private individual
Mandate: remediation of contaminated soil inside and outside a residential property.
Work Completed: 300.25 tons of contaminated soil and 19.23 tons of material was excavated/disposed of off-site

Saint-Louis-de-Blandford
Summer 2017
Client: contractor
Mandate: mixed remediation: on-site treatment and off-site management

Work Completed: 673 tons of soil excavated and treated using the Soltec mixer, as well as 875 tons of soil excavated/disposed of off-site.

Saint-Basile
Fall 2017
Client: National Defence
Mandate: contaminated soil remediation
Work Completed: 2021.24 tons of contaminated soil was excavated/disposed of off-site

2018

Anjou
Summer 2018
Client: oil contractor
Mandate: environmental rehabilitation in the context of the cessation of targeted activities (service station)
Work Completed: 2107.14 tons of contaminated soil and 54.09 tons of concrete and residual materials were excavated/disposed of off-site.

Quebec
Summer 2018
Client: Quebec City
Mandate: Environmental remediation through a call for tenders
Work Completed: 7,548.94 tons of contaminated soil, 242.86 tons of residual materials and 10,224.58 tons of incineration residues were excavated/disposed of off-site. In addition, 192,846 litres of water were pumped and disposed of.

Trois-Rivières
Summer 2018
Client: company president
Mandate: Environmental remediation by outdoor excavation and indoor in situ testing.
Work Completed: 119.14 tons of contaminated soil was excavated and disposed of off-site.

Berthierville
Fall 2018
Client: company president
Mandate: Environmental remediation by excavation
Work Completed: 705.28 tons of contaminated soil was excavated and disposed of off-site and 14,000 litres of groundwater meeting the target criteria was pumped and discharged into the city's sewer system.

Saint-Bruno
November 2018 to January 2019
Client: oil contractor
Mandate: environmental follow-up during the dismantling of petroleum facilities and rehabilitation by excavation in the context of a service station shutdown.
Work Completed: 861.59 tons of contaminated soil was excavated and disposed of off-site and 280,434 litres of water were treated on site.

2019

Oka
Spring 2019
Client: owner of a centre for disabled people
Mandate: environmental rehabilitation outside and under the foundations
Work Completed: 268.52 tons of contaminated soil and 23.62 tons of concrete were excavated and disposed of off-site.

Trois-Rivières
Spring and Summer 2019
Client: building owner
Mandate: rehabilitation by excavation and off-site disposal
Work Completed: 85.29 tons of contaminated soil and 27.14 tons of concrete (including 14.59 tons of contaminated soil) were excavated and disposed of off-site. 65,387 litres of water were treated on site.

Montréal
Spring and Summer 2019
Client: company president
Mandate: Environmental follow-up during dismantling work, as well as rehabilitation through excavation and off-site disposal.
Work Completed: 1,697.01 tons of contaminated soil and 170 litres of floating phase were disposed of off-site.

Sainte-Anne
Summer 2019
Client: Réseau de Transport du QC
Mandate: Soil remediation through a call for tenders.
Work Completed: 977.87 tons of contaminated soil excavated and disposed of off-site

Mont-Tremblant
Fall 2019
Client: restaurant owner
Mandate: Mixed remediation, including part by excavation and off-site management

Work Completed: 13.73 tons of contaminated soil was excavated and disposed of off-site.

Montréal
Fall 2019
Client: company president
Mandate: Mixed remediation, including part excavation and off-site management
Work Completed: 101.36 tons of contaminated soil was excavated and disposed of off-site.

Longueuil
December 2019
Client: owner of a revenue property
Mandate: Environmental remediation
Work Completed: 7.13 tons of contaminated soil was excavated and disposed of off-site using a vacuum truck.